Projects

EA1 Offshore Duct Installation
Client; Scottish Power RenewablesMain Contractor; Volker Infra (Visser Smit Hanab/Volker Wessels)4 No 1km long ducts, towed from Norway, stored within inland waterway (ducts 800mm & 600mm dia)140t excavator selection, procurement and mobilisation from NetherlandsMobilisation of Shoalbusters, Multicats & Jack Up Barges to support worksManagement of vessel approval process to allow access to wind farm worksiteFugro 1200 Barge, deck layout design, stability calculation and penetration analysis management and full management of equipment Load outManagement of the Connection of ducts (at sea) to HDD 1km off shore for pullback in 10m water depthMethodology development to remove siltation around installed assets through the use of Traditional and Mass flow excavation DredgingMethodology development and management of Mattressing and RockBag installationManagement of comprehensive Bathymetric Surveying campaign
Works carried out in North Sea through summer and winter season